PROJECTS

Every TEC project is public civil infrastructure for a city, county, state agency, federal agency or tribal government, delivered through the same QA/QC process every time. Where we worked as a subconsultant, we say so.

Client

South Florida Water Management District

Project

S-27 & S-29 Resiliency Pump Stations

Location

C-7 Canal (Miami) and C-9 Canal (North Miami Beach), FL

TEC Role

Site-civil design, utility coordination and QA/QC, as subconsultant

SFWMD canal structure at the S-27/S-29 pump station program
Urban canal-side site for an SFWMD resiliency pump station

About The Project

The Challenge

Under SFWMD’s Sea Level Rise and Flood Resiliency Plan, the S-27 and S-29 structures needed new forward-flow pump stations to restore flood protection for the C-7 and C-9 basins. S-27 is designed for 1,500 cfs with three pumps; S-29 for 2,500 cfs in six bays. Both sites are tight urban canal corridors, crowded with existing utilities.

What We Did

As a subconsultant, we designed the site layout and grading, access roads, staging areas and sheet-pile bulkheads. At S-29 we also designed canal improvements and shoreline grading at the adjacent park. We built the utility conflict-resolution matrix for both sites, including FPL overhead lines inside the footprint, and reviewed the survey and geotechnical data.

We produced Civil 3D drawings, permitting documents, specifications and bid-ready packages, and ran code-compliance reviews and QA/QC on every site-civil deliverable from Intermediate design through Ready-to-Advertise, working through DrChecks comment cycles. Our principal served as Lead QA/QC Engineer.

Results

  • Coordinated, permit-ready site-civil packages for both stations.
  • Our utility-impacts technical memorandum was accepted by SFWMD reviewers without revision.

Services: Site Civil Design · Utility Coordination · Permitting Documents · Specifications · QA/QC · Flood Resiliency