Civil infrastructure. 

Heavy civil and civil engineering projects for local, state and federal governments. Engineering, project management and construction management. That’s all we do.

// Our Partners

QA inspectors reviewing a pipe trench on the C-43 reservoir project.

We stay in our lane. We work in it every day.

// Our Commitments

What you get from us. In writing.

We don’t sell a long list of services. We do three things for public agencies (engineering, project management and construction management), and we’ve done them so many times that our QA/QC comes from repetition, not theory. These are the commitments that come with it.

01. A written scope within 48 hours.

Within 48 hours of a request, we walk the site and send back a written scope, deliverables, and schedule.

02. Estimates that hold up at bid.

We build cost estimates from real quantities and check them again at 30, 60, 90 and 100% design. Scope growth gets caught on paper, not in the field.

03. Problems get fixed before they’re buried.

Our inspectors use Three-Phase Control, the same process on a city drainage repair as on an Everglades reservoir: requirements are agreed before work starts, the first production work sets the standard, and every deficiency is closed before it’s covered up.

04. A record you can defend.

You get a daily report by the end of every working day, with GPS-tagged photos, quantities, test results and safety notes. You can see all of it. It’s your file at pay application, at claim, and at warranty.

05. Schedule slips get a plan, not an excuse.

We review contractor schedules monthly and look two weeks ahead. If a job starts slipping, you get a written recovery plan before the float is gone.

// Why TEC?

How we serve public agencies.

142 projects. 100% success rate.

Every one delivered on or under budget.

Rated 4.0 out of 4.0 by Miami-Dade Water and Sewer.

That’s the County’s highest score, earned in every category on our closeout evaluation: schedule, cost, quality, responsiveness and more.

Reservoir-grade quality control on city streets.

Our inspectors have done quality assurance on two of the largest Everglades reservoir programs, and we use the same process on a city drainage repair. We hold your project to that standard.

Five weeks, not twelve.

A storm washed out a Seminole Tribe roadway embankment. We had the repair designed in under five days, then bid it and rebuilt it in five weeks. That kind of repair typically takes eight to twelve.

Independent review, local response.

Before any design deliverable is sealed, a senior engineer who didn’t produce it reviews it independently. Our office is minutes from the cities we serve, and when something breaks, we can have inspectors and engineers mobilized within 24 hours.

We inspect what we design.

On North Miami Beach’s Eastern Shores drainage, we found the failures with CCTV, designed the fix, and now inspect its construction. One firm, start to finish.

// Our Achievements

Our track record

Projects
Delivered

Success
Rate

Banyan Pump Station

City of North Miami

Five Weeks, Not Twelve

Seminole Tribe of Florida

Eastern Shores Drainage

City of North Miami Beach

266 Streetlights + Traffic Calming Manual

City of North Miami Beach

C-43 Reservoir

South Florida Water Management District

S-27/S-29 Resiliency Pump Stations

South Florida Water Management District